ENTRE PRISES

CLIMBING WALLS

A Multi Phase Process


Entere Prises. Climbing Walls.
Climbat
Clip'n Climb
Join Our Email List
About Portfolio Standard Structures Climbing Walls News Services Holds / Store CONTACT
A Multi Phase Process > Installation


Royal Carribean Install
Royal Carribean Install
Royal Carribean Install
SUNY Potsdam Install
North Branch YMCA Install
next

Phase Four - Installation
There are many methods of installation and Entre Prises will determine (during the design phase) the most efficient and cost effective method for the project and location. Installation methods range from using existing structural walls onto which the climbing wall is attached; to craning in large prefabricated frames making the climbing wall freestanding.  Entre Prises coordinates the installation process to minimally impact the construction schedule or operating hours of a facility.

 

  • Ship wall to installation site
  • Entre Prises installation experts arrive and stage the installation site
  • Assemble and secure wall - as determined during design phase
  • Conduct walk through with client for final approval