Royal Carribean Install
|
| |
| | Phase Four - Installation There are many methods of installation and Entre Prises will determine (during the design phase) the most efficient and cost effective method for the project and location. Installation methods range from using existing structural walls onto which the climbing wall is attached; to craning in large prefabricated frames making the climbing wall freestanding. Entre Prises coordinates the installation process to minimally impact the construction schedule or operating hours of a facility.
- Ship wall to installation site
- Entre Prises installation experts arrive and stage the installation site
- Assemble and secure wall - as determined during design phase
- Conduct walk through with client for final approval
|
|